Skip to content

Sidewalk Work To Be Done Along Highway 32 Into December

Highway 32 in Ste. Genevieve County will be reduced to one lane as contractor crews remove and reconstruct the sidewalks in Ste. Genevieve.

Work will take place from Linn Drive to Gerard Street.

The construction was to begin Monday, September 16, and — weather permitting — continue through Sunday, December 15.

Work is expected to take place from 6 a.m. to 6 p.m. daily.

The work zone will be marked with signs. Motorists are urged to use caution while traveling near the area.

(Information in a release from the Southeast District of the Missouri Department Transportation.)

Leave a Comment